Sale!

MS52 IGNOU MBA solution 2024

Original price was: $4.50.Current price is: $3.75.

Category:

Buy complete ignou semester course at discounted price instead of MS52 IGNOU MBA Answers 2024. You can also Buy IGNOU MBA sample paper for quick exam preparation and better marks.

(Last date of submission for January 2023 session is 30th April, 2023 and for July 2023 sessions is 31st October, 2023)

1. What is project management? Discuss the components of project feasibility analysis with suitable examples.
2. Discuss the importance of market and demand analysis in project management.
3. Draw a network diagram for the activities given below and determine the critical path.
Activity Description Predecessor Duration (Months)
A Design Plant – 12
B Select Site A 8
C Select Vendor A 4
D Select Personnel A 3
E Prepare Site B 12
F Manufacture Generator C 18
G Prepare Operations Manual C 5
H Install Generator E,F 4
I Train Operators D,G 9
J Obtain License H,I 6

4. What is Work Breakdown Structure (WBS)? Develop a WBS for a project in which you are going to build a bicycle. Try to identify all the major components and provide three levels of detail.
5. Discuss the role of Total Quality Management practices in Project Management.

July 2022

1. What is a project? What are the characteristics of a project? Discuss the tools and techniques in project management.
2. Draw a project network for the following jobbing production.
ignou assignments mst2
a. Construct the project network diagram.
b. Calculate the time estimates (EST, EFT, LST and LFT) in the above project.
c. Find the critical path and critical activities and project duration in the above project?
3. What do you mean by an integrated project information system? Draw an MIS for 4-storeyed brick and residential building assuming that there is a magnificent component of marbling, tiling and sanitary work.
4. What is project quality management? Describe the quality control procedure in project management existing in an organization that you know.
5. Write a short note on the following:
i. Project feasibility study
ii. Project environment
iii. Project life cycle
iv. Triple constraints of a project

Why DistPub for IGNOU MBA Assignments?

Because, DistPub portal is dedicated for management assignment solution and give perfect mba solution for your distance learning assignment and exam material.

IGNOU MS52 MBA Assignment Question for Answer

Q1. “An important dimension of project management includes management of the expenditure incurred on the project”. Explain in the view of the statement, Cost Management as a tool of Project Management.

Q2. What is the concept of “Free Float “(Primary slackness) and “Total Float” (Secondary slackness)? Bring out their significance in project management.

Q3. “Design a simple reporting format which monitors conversion of purchase indents with orders. Assuming that no purchase indent shared be delayed more than eight weeks, how would you incorporate it in the above report.

Q4. Explain how commissioning is handled in large organizations.

Q5. Write short note on the following:-
1. Levels of demand forecasting.
2. Network based material management
3. Empowering Project Personnel.
4. Elements of control in projects.

View solved assignment of ignou

Post Graduation Diploma in Operations Management (PGDOM) ignou solved solution by expert operation management tutor.

  1. MS-7 new ignou assignment solved
  2. MS-51 new ignou assignment solved
  3. MS-52 new ignou assignment solved
  4. MS-53 new ignou assignment solved
  5. MS-54 new ignou assignment solved
  6. MS-55 new ignou assignment solved
  7. MS-56 new ignou assignment solved
  8. MS-57 new ignou assignment solved
  9. MS-58 new ignou assignment solved
  10. Operational Management project report
35e05bfd118ad824b0800d77c13b555a?s=120&d=mm&r=g

DistPubIndia

DistPub India Team provide academic writing help and we are working from year 2007 with highest satisfactions of student.

IGNOU Solution for December 2021MS52 IGNOU MBA solution 2024
Original price was: $4.50.Current price is: $3.75.