1. What is project management? Discuss the components of project feasibility analysis with suitable examples.
2. Discuss the importance of market and demand analysis in project management.
3. Draw a network diagram for the activities given below and determine the critical path.
Activity Description Predecessor Duration (Months)
A Design Plant – 12
B Select Site A 8
C Select Vendor A 4
D Select Personnel A 3
E Prepare Site B 12
F Manufacture Generator C 18
G Prepare Operations Manual C 5
H Install Generator E,F 4
I Train Operators D,G 9
J Obtain License H,I 6
4. What is Work Breakdown Structure (WBS)? Develop a WBS for a project in which you are going to build a bicycle. Try to identify all the major components and provide three levels of detail.
5. Discuss the role of Total Quality Management practices in Project Management.
July 2022
1. What is a project? What are the characteristics of a project? Discuss the tools and techniques in project management.
2. Draw a project network for the following jobbing production.
a. Construct the project network diagram.
b. Calculate the time estimates (EST, EFT, LST and LFT) in the above project.
c. Find the critical path and critical activities and project duration in the above project?
3. What do you mean by an integrated project information system? Draw an MIS for 4-storeyed brick and residential building assuming that there is a magnificent component of marbling, tiling and sanitary work.
4. What is project quality management? Describe the quality control procedure in project management existing in an organization that you know.
5. Write a short note on the following:
i. Project feasibility study
ii. Project environment
iii. Project life cycle
iv. Triple constraints of a project
Why DistPub for IGNOU MBA Assignments?
Because, DistPub portal is dedicated for management assignment solution and give perfect mba solution for your distance learning assignment and exam material.
IGNOU MS52 MBA Assignment Question for Answer
Q1. “An important dimension of project management includes management of the expenditure incurred on the project”. Explain in the view of the statement, Cost Management as a tool of Project Management.
Q2. What is the concept of “Free Float “(Primary slackness) and “Total Float” (Secondary slackness)? Bring out their significance in project management.
Q3. “Design a simple reporting format which monitors conversion of purchase indents with orders. Assuming that no purchase indent shared be delayed more than eight weeks, how would you incorporate it in the above report.
Q4. Explain how commissioning is handled in large organizations.
Q5. Write short note on the following:-
1. Levels of demand forecasting.
2. Network based material management
3. Empowering Project Personnel.
4. Elements of control in projects.
View solved assignment of ignou
Post Graduation Diploma in Operations Management (PGDOM) ignou solved solution by expert operation management tutor.
- MS-7 new ignou assignment solved
- MS-51 new ignou assignment solved
- MS-52 new ignou assignment solved
- MS-53 new ignou assignment solved
- MS-54 new ignou assignment solved
- MS-55 new ignou assignment solved
- MS-56 new ignou assignment solved
- MS-57 new ignou assignment solved
- MS-58 new ignou assignment solved
- Operational Management project report