System Analysis Design Set 4

QN1. Requirement specification is carried out
a) After requirements are determined
b) Before requirements are determined
c) Simultaneously with requirements determination
d) Independent of requirements determination
Answer

Answer: a) After requirements are determined

QN2. The role of a system analyst drawing up a requirements specification is similar to
a) Architect designing a building
b) A structural engineer designing a building
c) A contractor constructing a building
d) The workers who construct a building
Answer

Answer: a) Architect designing a building

QN3. It is necessary to consult the following while drawing up requirement specification
a) Only top managers
b) Only top and middle management
c) Only top, middle and operational managers
d) Top, middle and operational managers and also all who will use the system
Answer

Answer: d) Top, middle and operational managers and also all who will use the system

QN4. In order to understand the working of an organization for which a computer based system is being designed, an analyst must
a) Look at only current work and document flow in the organization
b) Discuss with top level and middle level management only
c) Interview top, middle, line managers and also clerks who will enter data and use the system
d) Only clerical and middle level staff who have long experience in the organization and will be users of the system
Answer

Answer: c) Interview top, middle, line managers and also clerks who will enter data and use the system

QN5. A feasibility study is carried out
a) After final requirements specifications are drawn up
b) During the period when requirements specifications are drawn up
c) Before the final requirements specifications are drawn up
d) At any time
Answer

Answer: c) Before the final requirements specifications are drawn up

QN6. The main objective of feasibility study is
a) to assess whether it is possible to meet the requirements specifications
b) to assess if it is possible to meet the requirements specified subject to constraints of budget, human resource and hardware
c) to assist the management in implementing the desired system
d) to remove bottlenecks in implementing the desired system
Answer

Answer: b) to assess if it is possible to meet the requirements specified subject to constraints of budget, human resource and hardware

QN7. Hardware study is required
a) To find out cost of computer system needed
b) To determine the type of computer system and software tools needed to meet the final system specification
c) To make sure that the system does not become obsolete
d) To find how to implement the system
Answer

Answer: b) To determine the type of computer system and software tools needed to meet the final system specification

QN8. Feasibility study is carried out by
a) Managers of the organization
b) System analyst in consultation with managers of the organization
c) Users of the proposed system
d) Systems designers in consultation with the prospective users of the system
Answer

Answer: b) System analyst in consultation with managers of the organization

QN9. Initial requirements specification is
a) Not changed till the end of the project
b) Continuously changed during project implementation
c) Only a rough indication of the requirement
d) Changed and finalized after feasibility study
Answer

Answer: c) Only a rough indication of the requirement

QN10. The primary objective of system design is to
a) Design the programs, databases and test plan
b) Design only user interfaces
c) Implement the system
d) Find out how the system will perform
Answer

Answer: a) Design the programs, databases and test plan

QN11. System test plan is specified
a) When the final specifications are drawn up
b) During feasibility study
c) During the requirements specifications stage
d) During system study stage
Answer

Answer: a) When the final specifications are drawn up

QN12. System design is carried out
a) As soon as system requirements are determined
b) Whenever a system analyst feels it is urgent
c) After final system specifications are approved by the organization
d) Whenever the user management feels it should be done
Answer

Answer: c) After final system specifications are approved by the organization

QN13. The primary objective of system implementation is
i) To build a system prototype
ii) To train users to operate the system
iii) To implement designed system using computers
iv) Write programs, create databases and test with live data
a) i, iii
b) i, ii, iii
c) ii, iii
d) ii, iv
Answer

Answer: d) ii, iv

QN14. The main objective of system evaluation is
a) To see whether the system met specification
b) To improve the system based on operational experience for a period
c) To remove bugs in the programs
d) To asses the efficiency of the system
Answer

Answer: b) To improve the system based on operational experience for a period

QN15. A data dictionary has consolidated list of data contained in
(i) Data flows
(ii) Data stores
(iii) Data outputs
(iv) processes
a) (i) and (iii)
b) (i) and (ii)
c) (ii) and (iv)
d) (i) and (iv)
Answer

Answer: b) (i) and (ii)

QN16. System analysts have to interact with
i) Managers of organizations
ii) Users in the organization
iii) Programming team
iv) Data entry operator
a) iii and iv
b) i, ii and iii
c) ii, iii and iv
d) ii and iii
Answer

Answer: b) i, ii and iii

QN17. Systems analyst should use software tools in their work as
a) All analysts use them
b) They assist in systematic design of systems
c) They are inexpensive
d) They are easily available
Answer

Answer: b) They assist in systematic design of systems

QN18. During feasibility analysis it is necessary to examine several alternative solutions because
(i) A comparison of alternatives will lead to a cost-effective solution
(ii) A pre-conceived single solution may turn out to be unimplementable
(iii) It is always good to examine alternatives
(iv) Management normally looks at alternatives
a) i and iii
b) i and iv
c) i and ii
d) ii and iv
Answer

Answer: c) i and ii

QN19. The primary responsibility of a systems analyst is to
a) Specify an information system which meets the requirements of an organization
b) Write programs to meet specifications
c) Maintain the system
d) Meet managers of the organization regularly
Answer

Answer: a) Specify an information system which meets the requirements of an organization

QN20. The responsibilities of a system analyst include
i) Defining and prioritizing information requirement of an organization
ii) Gathering data, facts and opinions of users in an organization
iii) Drawing up specifications of the system for an organization
iv) Designing and evaluating the system
a) i and ii
b) i, ii and iv
c) i, ii, iii and iv
d) i, ii and iii
Answer

Answer: d) i, ii and iii

QN21. The intangible benefits in the following list are
(i) Savings due to reducing investment
(ii) Savings due to sending bills faster and consequent early collection
(iii) Providing better service to the customers
(iv) Improving quality of company’s products
a) i and ii
b) ii and iii
c) iii and iv
d) i and iii
Answer

Answer: c) iii and iv

QN22. In a DFD external entities are represented by a
a) Rectangle
b) Ellipse
c) Diamond shaped box
d) Circle
Answer

Answer: a) Rectangle

QN23. A data flow can
a) Only emanate from an external entity
b) Only terminate in an external entity
c) May emanate and terminate in an external entity
d) May either emanate or terminate in an external entity but not both
Answer

Answer: c) May emanate and terminate in an external entity

QN24. The most important attribute of a systems analyst is
a) Excellent programming skills
b) Very good hardware designing skills
c) Very good technical management skills
d) Very good writing skills
Answer

Answer: c) Very good technical management skills

QN25. Data inputs which required coding are
a) Fields which specify prices
b) Key fields
c) Name fields such as product name
d) Fields which are of variable length
Answer

Answer: b) Key fields

QN26. An entity is
a) A collection of items in an application
b) A distinct real world item in an application
c) An inanimate object in an application
d) A data structure
Answer

Answer: b) A distinct real world item in an application

QN27. A relationship is
a) An item in an application
b) A meaningful dependency between entities
c) A collection of related entities
d) Related data
Answer

Answer: b) A meaningful dependency between entities

QN28. A cost-benefit analysis is performed to assess
a) Economic feasibility
b) Operational feasibility
c) Technical feasibility
d) All of the above
Answer

Answer: a) Economic feasibility

QN29. Among the attributes of a systems analyst the following are most important
i) Knowledge of computer systems and currently available hardware
ii) Good interpersonal relations
iii) Broad knowledge about various organizations
iv) Very good accountancy knowledge
a) i, iii and iv
b) i and iii
c) i, ii and iv
d) i, ii and iii
Answer

Answer: d) i, ii and iii

QN30. A rectangle in a DFD represents
a) A process
b) A data store
c) An external entity
d) An input unit
Answer

Answer: c) An external entity

QN31. The entity set is a
a) Set of entities
b) Collection of different entities
c) Collection of related entities
d) Collection of similar entities
Answer

Answer: d) Collection of similar entities

QN32. Attributes are
(i) Properties of relationship
(ii) Attributed to entities
(iii) Properties of members of an entity set
a) i
b) i and ii
c) i and iii
d) iii
Answer

Answer: c) i and iii

QN33. Rows of a relation are called
a) Tuples
b) A relation row
c) A data structure
d) An entity
Answer

Answer: a) Tuples

QN34. If an entity appears in N relationships then it is
a) A 1:1 relationship
b) A 1: N relationship
c) A N: 1 relationship
d) A N: M relationship
Answer

Answer: b) A 1: N relationship

QN35. Normalization is a process of restructuring a relation to
a) Minimize duplication of data in a database
b) Maximize duplication of data to ensure reliability
c) Make it of uniform size
d) Allow addition of data
Answer

Answer: a) Minimize duplication of data in a database

QN36. Normalization of database is essential to
(i) Avoid accidental deletion of required data when some data is deleted
(ii) Eliminate inconsistencies when a data item is modified in the database
(iii) Allows storage of data in a computer’s disk
(iv) Use a database management system
a) i and iii
b) i and ii
c) ii and iii
d) ii and iv
Answer

Answer: b) i and ii

QN37. A relation is said to be in 1NF if
a) There is no duplication of data
b) There are no composite attributes in the relation
c) There are only a few composite attributes
d) All attributes are of uniform type
Answer

Answer: b) There are no composite attributes in the relation

QN38. By redundancy in a file based system we mean that
a) Unnecessary data is stored
b) Same data is duplicated in many files
c) Data is unavailable
d) Files have redundant data
Answer

Answer: b) Same data is duplicated in many files

QN39. Data integrity in a file based system may be lost because
a) The same variable may have different values in different files
b) Files are duplicated
c) Unnecessary data is stored in files
d) Redundant data is stored in files
Answer

Answer: a) The same variable may have different values in different files

QN40. Given the following relation— vendor order (vendor no, order no, vendor name, qty supplied, price/unit) it is not in 2 NF because
a) It is not in 1 NF
b) It has a composite key
c) Non-key attribute vendor name is dependent on vendor no. which is one part of the composite key
d) Qty supplied and price/unit are dependent
Answer

Answer: c) Non-key attribute vendor name is dependent on vendor no. which is one part of the composite key