Process Analysis and Theory of Constraints-1

$7.50

Category:

Process Analysis and Theory of Constraints

Assignment – A

 

Q1: Discuss the Project panning, Project execution and continuous improvement

Q2: Elaborate the Problem Associated With Company’s Existing Scheduling Technique

Q3: Discuss the meaning & concept of CCPM.

Q4: Discuss the HYPOTHESIS TESTING.

Q5: Discuss the Introduction to TOC applications in operations improvement.

Q6: Explain the process of benchmarking in detail.

Q7: Explain the Interface of process analysis with other disciplines

Q8: Explain the meaning of process analysis & process-based management.

 

Case Study

Q1: What do you understand by DBR? Discuss its approach & scheduling

Q2: What do you understand by synchronous manufacturing? Discuss the Symptoms of poor synchronization.

Q3: Elaborate the Problem Associated With Company’s Existing Scheduling Technique

 

Assignment – C

 

Q1: What is Critical chain project management (CCPM) is a method of planning and ……………….. projects?

( ) managing

( ) handling

( ) supervision

( ) administration

Q2: ………………………… can determine a size of project, feeding, and resource buffers.

( ) Critical chain methodology

( ) Process chain methodology

( ) Event chain methodology

( ) None of Above

Q3: The transition from the traditional silo-based business paradigm to supply chain management requires ………………. changes in organizational structures, cultures, and business strategy.

( ) Controllable & Dynamic

( ) Traumatic

( ) Never changed & controllable

( ) Static & Stable

Q4: Critical chain project management is based on methods and algorithms derived from ……………………………………….

( ) Theory of Constraints

( ) Throughput Accounting

( ) Event chain methodology

( ) Process chain methodology

Q5:  DBR methodology provides a mechanism for protecting total throughput of the system by the use of Time-buffers?

( ) True

( ) False

( ) .

( ) .

Q6: Theory in operations has undergone significant change in the past ……………. with a shift from an economics cost based view

( ) 40 years

( ) 50 years

( ) 70 years

( ) 90 years

Q7: The benefit of clearly communicating the project status through buffer management and regular reporting was acknowledged as key to gaining what was referred to as ‘ ………………………… information’ across the project

( ) TA

( ) TOC

( ) SIT

( ) JIT

Q8: Critical chain is an alternative to ……………………………

( ) Process analysis

( ) critical path analysis

( ) Scenario

( ) Environment

Q9: ICT is nothing more than a ………………… for supply chain transformations and is not a solution for such transformations.

( ) Storage

( ) accelerator

( ) catalyst

( ) Strategizing

Q10: The cumulative capability model emerged and subsequently led to theoretical models that encompass flow, trade-offs and continuous.

( ) Customer

( ) Mediator

( ) Expert

( ) Cumulative

Q11: The choice of process flow can depend on what stage in the product life cycle the firm is at?

( ) Economic Activity

( ) Sale Activity

( ) Retail Activity

( ) Logistics Activity

Q12: A …………………….. is an organized way of collecting and structuring data, its purpose is to collect the facts in the most efficient way:

( ) Histogram

( ) Dots or Tally

( ) Check Sheet

( ) Control Charts

Q13: The ……………………discipline develops and maintains the supporting artifacts that are used during Analysis and Design.

( ) Requirement

( ) Environment

( ) Test

( ) Organizational

Q14: The ……………………… is a tool for analyzing the relationship between the product life cycle and the technological life cycle

( ) product-process matrix

( ) Process Analysis

( ) Product Based Management

( ) Process Selection

Q15: A process flow structure generally falls into two categories: it can be either a job shop or a flow shop?

( ) Incomplete statement

( ) Not a justified statement

( ) False

( ) True

Q16: A …………………………. is the characteristic of a given product that causes the buyer to purchase it rather than the similar product of a competitor.

( ) Distinctive competence

( ) Competitors

( ) Management

( ) Organization

Q17: The continuous flow process is similar to the …………………….. as it has a fixed sequence and a set pace

( ) Life cycle

( ) Process line

( ) Product line

( ) Assembly line

Q18: The choice of process flow can depend on the …………in the product life cycle the firm is at?

( ) World

( ) Stage

( ) Level

( ) Class

Q19: ………… is an integral part of merchandising

( ) Money

( ) Sales Promotion

( ) Storage

( ) Strategising

Q20: Job shop process are sometimes referred to as ‘…………………..’.

( ) Customer shops

( ) Retail Shops

( ) Medicinal shops

( ) Sweat shops

Q21: A company should …………… focus on productivity and price recovery to be as profitable as possible

( ) Mutually

( ) Independently

( ) Inter-dependably

( ) Universally

Q22: …………………. is in industrial engineering generally defined as the relation of output (i.e. produced goods) to input (i.e. used resources) in the manufacturing transformation process.

( ) Productivity

( ) Profitability

( ) Performance

( ) Production

Q23: ………………… is strongly influenced by the prices a company pays for its input and receives for its output

( ) Productivity

( ) Profitability

( ) Performance

( ) Production

Q24: There is no sense in denying that productivity and profitability are interdependent, but it is also a fact that they do not always go hand in hand

( ) Incomplete statement

( ) Not a justified statement

( ) False

( ) True

Q25: Fast operations reduce the level of in-process inventory between micro operations, as well as reducing administrative overhead.

( ) Incomplete statement

( ) Not a justified statement

( ) False

( ) True

Q26: ………………………… can be described as an important aid to making judgements and to making decisions.

( ) Performance measurement

( ) Performance Evaluation

( ) Performance Scheduling

( ) Performance Management

Q27: The …………………. includes financial performance measures giving the results of actions already taken

( ) The Sink and Tuttle framework

( ) TOPP

( ) Performance Pyramid

( ) Balanced scorecard

Q28: Shorter cycle times suggest delivering value to the organization quickly and do not have money unnecessarily tied up in ………….. (Unreleased code).

( ) Account

( ) Inventory

( ) Level

( ) Record

Q29: Throughput is the rate at which a system achieves its goal.

( ) Cycle time

( ) Throughput

( ) Setup time

( ) Lead time

Q30:  ………………… is the time from the moment the customer places an order (the moment you learn of the requirement) to the moment it is ready for delivery’.

( ) Cycle time

( ) Throughput

( ) Setup time

( ) Lead time

Q31:  What is Theory of constraints (TOC)?

( ) systems-management philosophy

( ) Retail Management philosophy

( ) Logistics Management Activity

( ) Organizational activity

Q32: The Theory of Constraints is a methodology for identifying the most important …………………….:

( ) Fixed factor

( ) Variable factor

( ) Limiting factor

( ) None of Above

Q33: ……………….capacity is an excess amount of production capacity that is assembled in the work stations that are positioned upstream from the constraint operation.

( ) Spring

( ) Sprint

( ) Smart

( ) Saturated

Q34: Application of conventional accounting may actually …………….. throughput and profits.

( ) Decrease

( ) Increase

( ) Improve

( ) Downfall

Q35: Constraints accounting is an accounting reporting technique, consistent with a process of ongoing improvement and implementation of TOC

( ) Not applicable

( ) Un-justified

( ) False

( ) True

Q36: Major assumption of TA is that once a certain capacity level exists, all the operating expenses associated with it are no longer ……………………………..

( ) Actionable or changeable

( ) Dominant

( ) Operational

( ) Functional

Q37:  TOC’s critical chain concept removes the implicit assumption of infinite capacity from the …………… management domain

( ) Functional

( ) Geographical

( ) Mathematical

( ) Project

Q38: The ……………………… tree helps identify the obstacles to implementation

( ) Transition

( ) Prerequisite

( ) Future reality

( ) Current reality

Q39: Traditional finished goods inventory, as well as excess work-in-process and excess raw materials inventories, are liabilities in the ………….. world.

( ) LTP

( ) TA

( ) TOC

( ) None of above

Q40: Most of the constraints faced in systems originate from policies, not physical things.

( ) in-appropriate

( ) Not justified

( ) Incorrect

( ) Correct

35e05bfd118ad824b0800d77c13b555a?s=120&d=mm&r=g

DistPubIndia

DistPub India Team provide academic writing help and we are working from year 2007 with highest satisfactions of student.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

PlaceholderProcess Analysis and Theory of Constraints-1
$7.50