Software project management mcq set 3

Q81: Dispersion of a process in monitored in

  • A. Range chart
  • B. Mean chart
  • C. p-chart
  • D. c-chart
Answer

Answer A. Range chart

Q82: The control chart used for the fraction of defective items in a sample is

  • A. Range chart
  • B. Mean chart
  • C. p-chart
  • D. c-chart
Answer

Answer C. p-chart

Q83: The control chart used for the number of defects per unit is

  • A. Range chart
  • B. Mean chart
  • C. p-chart
  • D. c-chart
Answer

Answer D. c-chart

Q84: Risk Table is___representation of the expected risks in a project

  • A. Round Table
  • B. Assessment Table
  • C. Time Table
  • D. Tabular
Answer

Answer D. Tabular

Q85: CCTA stands for___

  • A. central commission of telecommunication agency
  • B. central computing and telecommunication agency
  • C. central computing and telecom agency
  • D. an NGO
Answer

Answer B. central computing and telecommunication agency

Q86: Hardware and software standards are needed so that various___can communicate with each other

  • A. Hardware
  • B. Systems
  • C. Software
  • D. Shareware
Answer

Answer B. Systems

Q87: The complete products handed over to the customers at the end of projects are called as___

  • A. software
  • B. application program
  • C. deliverables
  • D. intermediate products
Answer

Answer C. deliverables

Q88: Product is the result of___

  • A. Software
  • B. System
  • C. Control
  • D. Activity
Answer

Answer D. Activity

Q89: Product description contains___

  • A. name of the product
  • B. form of the product
  • C. quantity of the product
  • D. both a and b
Answer

Answer D. both a and b

Q90: Which one of the following is NOT an agile method?

  • A. SCRUM
  • B. Extreme Programming (XP)
  • C. DSDM
  • D. Waterfall
Answer

Answer D. Waterfall

Q91: Same generic fragment relates to more than___instance of the particular type of the product

  • A. one
  • B. two
  • C. three
  • D. four
Answer

Answer A. one

Q92: ___is the amount of work that needs to be done

  • A. Effort
  • B. Energy
  • C. Capacity
  • D. Strength
Answer

Answer A. Effort

Q93: Project planning is an___process

  • A. continuous
  • B. iterative
  • C. time consuming
  • D. conventional
Answer

Answer B. iterative

Q94: In order to carry out a successful strategic assessment of a potential project there should be strategic plan clearly defining the organization’s___

  • A. objectives
  • B. rules
  • C. conditions
  • D. ideas
Answer

Answer A. objectives

Q95: The standard way of evaluating the economic benefits of any projects is to carry out a___analysis

  • A. price-benefit
  • B. cost-benefit
  • C. cash flow
  • D. fund flow
Answer

Answer B. cost-benefit

Q96: ___of actual measured results against those planned is the fundamental principle of project monitoring process

  • A. variance
  • B. Evaluation
  • C. corrective action
  • D. Evaluation and comparison
Answer

Answer D. Evaluation and comparison

Q97: Whenever there is a variance,___is required to keep the project on schedule and to budget

  • A. variance
  • B. Evaluation
  • C. corrective action
  • D. Evaluation and comparison
Answer

Answer C. corrective action

Q98: When multifunctional terms are used to plan complex projects, the work must be

  • A. Integrated and coordinated
  • B. Managed
  • C. Translated
  • D. Interfaced
Answer

Answer A. Integrated and coordinated

Q99: he items to be delivered from a project which includes reports and plans as well as physical objects, is known as

  • A. Task assigned
  • B. Deliverables
  • C. Non-deliverables
  • D. Hierarchy planning
Answer

Answer B. Deliverables

Q100: The individual components of a system to achieve the desired performance, is taken care a

  • A. Performance
  • B. Critical Analysis
  • C. Effectiveness
  • D. Cost analysis
Answer

Answer C. Effectiveness

Q101: Person in charge of the basic product design and development and is responsible for functional analysis, is

  • A. Contract Administrator
  • B. System Architect
  • C. Test Engineer
  • D. Support Services Manager
Answer

Answer B. System Architect

Q102: A description of a task that defines all the work required to accomplish it, including inputs and desired outputs, is known as

  • A. Work statement
  • B. Problem statement
  • C. Work Definition
  • D. Problem definition
Answer

Answer A. Work statement

Q103: What should be the function of organization?

  • A. Co-ordination of various department
  • B. To prepare structure of organisation
  • C. To monitor various activities and progress
  • D. All of the above
Answer

Answer D. All of the above

Q104: Select from the below principles of ideal organization?

  • A. Unity of job assignment
  • B. Span of management
  • C. Separation of work
  • D. All of the above
Answer

Answer D. All of the above

Q105: What is the significance of Unity of Command as principle of organization?

  • A. Employee should be able to work independently
  • B. Employee should work in team unity
  • C. Employee should know to whom he is answerable
  • D. None of the above
Answer

Answer C. Employee should know to whom he is answerable

Q106: Delegation of authority as principle of organisation means___

  • A. To allocate duties and responsibility
  • B. To allocate funds and resources
  • C. To allocate time
  • D. None of the above
Answer

Answer A. To allocate duties and responsibility

Q107: By which pattern different structures of organizations can be formed?

  • A. Number of employees
  • B. Manner of distribution of authority
  • C. Number of divisions
  • D. Type of work done
Answer

Answer B. Manner of distribution of authority

Q108: Which of the following is a type of structure of organization?

  • A. Line or military organization
  • B. Line and staff organization
  • C. Both a & b
  • D. None of the above
Answer

Answer C. Both a & b

Q109: Which of these is not an advantage of line organization?

  • A. It permits quick decision
  • B. It provides strong discipline
  • C. It is most effective and economical
  • D. It is rigid and inflexible
Answer

Answer D. It is rigid and inflexible

Q110: Which if these are disadvantage of line organization?

  • A. Top executives are over loaded
  • B. System has no provision of rewarding good workers
  • C. Inadequacy of communication
  • D. All of the above
Answer

Answer D. All of the above

Q111: Line and staff organization structure is not suitable for___

  • A. Large and Complex enterprise
  • B. Enterprise undertaking heavy projects
  • C. Key men needs expert advice
  • D. All of the above
Answer

Answer D. All of the above

Q112: ___is the advantage of line and staff organization

  • A. Project can be executed with batter quality
  • B. It provides more job opportunity
  • C. Discipline problems are solved by line authority
  • D. All of the above
Answer

Answer D. All of the above

Q113: Which of these is not a type of project management organization?

  • A. Multinational organization
  • B. Functional organization
  • C. Matrix organization
  • D. Pure project organization
Answer

Answer A. Multinational organization

Q114: Which of these is not a disadvantages of functional organization?

  • A. Co-ordination is difficult
  • B. Quality of work is enhanced
  • C. Difficult to fix responsibility
  • D. High overhead cost
Answer

Answer B. Quality of work is enhanced

Q115: What are the advantages of matrix organization?

  • A. Removes weakness of line and staff organization
  • B. Quick response to changes
  • C. Higher administrative cost
  • D. Batter balance between time, cost and performance
Answer

Answer C. Higher administrative cost

Q116: Who is the key responsible person in Pure Project organization?

  • A. Project Manager
  • B. Site Engineer
  • C. Contractor
  • D. Structural Engineer
Answer

Answer A. Project Manager

Q117: Which of these is not a responsibility of Project Manager?

  • A. Planning
  • B. Designing
  • C. Organising
  • D. Directing
Answer

Answer B. Designing