LS2658: A worker in a manufacturing industry is expected to work for a minimum of 400 minutes, in an 8-hour shift. The remaining 80 minutes are meant for his personal and rest needs.

150.00

SKU: b091c6926e35 Category:

Description

Downloadable Assignment Solution

Buy this solution and download mba assignment solution instantly after secured paypal payment.

Question: A worker in a manufacturing industry is expected to work for a minimum of 400 minutes, in an 8-hour shift. The remaining 80 minutes are meant for his personal and rest needs.

Calculate the following:

(i) Standard time per piece of a job whose normal time is 10 min.

(ii) Number of piece to be produced per day.

(iii) Efficiency of worker for 36 jobs he produced in a shift.

 


Complete MBA Assignments Solution

You can buy complete assignment solution. Visit yours university link from top menu and buy online. You can also post your assignment requirement through support ticket system, so our expert assignments tutor will solved your problem.

Become Premium Member

30 Days Validity – Rs. 2,000/- Only. Buy MBA Assignment Membership.

3 Months Vailidy – Rs. 5,000/- Only. Buy MBA Assignment Membership.

1 Year Validity – Rs. 10,000/- only. Buy MBA Assignment Membership.

Study Link

You can study this assignment question from this link. Visit Now for MBA Assignment